houzez
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114Building/Space Description:
Suite E is a commercial condominium constructed in 2000 as a contractor’s sales office and warehouse. Unit upgrades include conference room, private offices, a 700 sf warehouse, grade level electric roll-up door, showroom area, ADA restroom with mop sink, storage room and a wet bar. The unit is fully sprinklered, and has 200 amp power. Building signage with direct exposure to Hwy. 101 with approximately 7,000 passing cars per hour.
HIGHLIGHTS: